Most of an install day is planning and equipment, but the stretch that affects your household most is the cutover: the window when the water is shut off, the new equipment is connected, and the water comes back on. Knowing who does each step, and what you should see at each one, keeps that window short and makes it easy to spot a leak before the crew leaves.

Before the crew cuts into the line

Ask who will close the main shutoff and who will tell you when it is off. Confirm where the shutoff is and test whether it closes fully. Older gate valves can fail to seal or start leaking once they are worked, so ask the installer what they will do if the existing shutoff will not hold. They may need to isolate the work at a different point, and you should hear that plan before the water goes off, not during the cut.

Ask whether the house will be without water for the day, and whether you should store water for drinking and for flushing toilets. Ask how long the crew expects the shutoff to last, and who will call you if that changes.

Confirm the bypass plan. A properly plumbed system includes a bypass so the house can still receive untreated water if the unit needs servicing. Ask what type of bypass is installed, where its handle is, and which position sends water around the equipment. Have the installer point to it before they start, so you know the setting for both untreated and treated water.

During the cut and connection

Ask whether the crew will flush the new lines before the unit goes in-line. Debris and cutting residue can reach the media if it is not cleared first, and a flush is a reasonable step to request.

Watch the bypass position while the connections are made. The valve should be set so water goes around the equipment during the work, and it should not be left in a partly open or uncertain position. If you are not sure what you are looking at, ask the crew to show you the setting again.

Restoring the water

Ask who opens the main and in what order. A careful sequence usually looks like this: confirm the bypass setting, open the main slowly, check each new joint and the drain connection for leaks, run a cold tap and a hot tap until the air clears, and only then move the unit out of bypass. Do not let anyone rush the last step.

Check each joint with your own eyes and a dry paper towel. A small seep often shows up within the first hour of pressure, so do not leave until the crew has watched the connections under pressure for a while.

Before the crew leaves, confirm three things: the bypass handle position, where the unit's controls are, and which setting puts the unit into treated service. Ask the installer to show you how to isolate the unit with the bypass if it leaks or needs attention later. Keep the answer in writing if you can.

Questions to ask before you sign off

  • What is the expected water-off window, and who will call you if it changes?
  • What happens if the existing shutoff will not seal?
  • Which valves are shutoffs, and which valve is the bypass?
  • Will the new lines be flushed before the unit is in service?
  • Who checks for leaks after the crew leaves, and how do you reach them?
  • Will they leave a written note of the bypass position at handover?

The same steps on a service visit

A service visit uses the same cutover logic on a smaller scale. Before a technician isolates the unit, ask them to set the bypass so the house keeps water. When the work is done, ask them to return the unit to service and show you the handle position. If you are comparing companies on how they handle this step, the criteria on our ranking methodology page explain how we weigh installation practices.