Many homeowners treat the end of an installation as the finish line. The crew connects the unit, the water starts moving, and everyone wants to get on with the day. The start-up is the part that decides whether the unit actually works. Before the installer leaves, you should know that the water is safe to use, that the settings match what you agreed to, and that you have what you need to call for service later.
Ask for the start-up steps before the crew begins
Ask the installer to walk you through the start-up sequence before they open anything. A good installer can tell you, in order, what they will do: turn the water back on slowly, bleed the air from the lines, start the first cycle, set the controls, run the water, and test the output. If they cannot describe the order, that is worth noticing. Ask them to keep the owner's manual, the settings sheet, and the warranty paperwork together so you can check them against what happens during the visit.
Check every joint while the water comes back on
When the supply goes back on, watch each connection before you walk away. Look at the inlet and outlet fittings, the drain line connection, and any bypass valve. A slow seep at a joint may not show up in the first minute, so ask the installer to check again after the unit has run through a full cycle. Look under the unit and around the base as well, since a drip can run down a pipe and collect in a spot you would not see from the front. If anything wet appears, ask for it to be fixed on the spot and written on the completion sheet.
Confirm the drain and the air gap
A treatment unit that regenerates or backwashes sends water down a drain, and that drain has to work every time. Check that the drain line is secured, not kinked, and runs to the place the plan said it would. Ask the installer to show you the drain path and point out any air gap. Do not accept a line that loops back into a trap or sits below the level it needs to drain properly. Ask how the drain was tested, not just whether it looks fine.
Read the settings back before the crew leaves
This is the step most people skip. Ask the installer to read each setting aloud or show it on the display, and compare each one against the settings sheet you agreed to. Common items include the water hardness or program setting, flow rate, regeneration or backwash timing, and the clock. If the sheet and the display do not match, correct the unit and write down the final values. Ask for a copy of the final settings with the date the installer completed the work, and keep it with the manual.
Check the power source the installer used
Confirm which outlet the unit plugs into. A unit on a shared power strip or a switch that someone can turn off by accident will eventually stop working, sometimes without any sign. Ask the installer to confirm that the outlet is dedicated to the unit, that it is the outlet specified in the plan, and that the unit is not controlled by a switch unless you chose that on purpose. Ask what the unit does after a power interruption, so you know what to look for later.
Run the water and judge it with your own senses
Run a cold tap in the kitchen and another one farther from the unit. Let the water run for the length of time the installer recommends, then fill a clean glass and look at it in good light. Notice any cloudiness, grit, color, or odor. Smell the water from the cold tap, not the hot tap, since the hot tap can carry its own smell from the water heater. If the installer provided a test kit or arranged a lab sample, decide who collects the sample and who receives the result before they leave, and write that down. Do not sign off on a unit based only on how the water looks at one tap at one moment.
Get the handoff in writing
Before you sign anything, ask for a short handoff sheet that lists the unit model, the serial number, the final settings, the date of the installation, the warranty period, the service contact, and the name of the person who will answer if something goes wrong. Ask the installer to show you where the shutoff valve is, how to check the unit's status light or display, and how to switch the unit into bypass if you need to. Ask what you should check in the first week and in the first month. Any open item, such as a part on backorder or a follow-up visit, should be written on the sheet with a name beside it.
Do not sign until the tests pass
A completion signature tells the company that the work is accepted. Sign only after the joints are dry, the drain has been checked, the settings match the sheet, the water runs clean at the taps you tested, and the handoff sheet is complete. If something is wrong, ask for the fix before the crew leaves, or write the problem on the sheet so it is on record. A short delay on start-up day is far easier to manage than a leak or a bad settings change that shows up a week later.