Before anyone orders a unit, someone should walk through your home and take measurements. This visit is where the job gets fitted to your house. If the visit is a short look at the spot where the tank might go, followed by a sales conversation, several numbers that affect the install are still unknown when you sign.

Water pressure and the supply line

Ask the technician to measure static water pressure with a gauge at an outdoor hose bib or a utility sink, and to write the reading on the paperwork. Ask what size the main supply pipe is where it enters the house, and whether any section looks narrowed, corroded, or repaired. A reading at one spigot can hide a restriction further along the line. Ask what they will do if the reading falls outside the range the equipment expects, and whether that changes the price or the unit they recommend.

Water testing during the visit

Ask whether the visit includes a test at the tap, or whether the company relies on a report you provide. If you already have a lab report, check which taps it covers and when the sample was drawn, then ask the technician to confirm that the report matches the water going into the house. Whatever method they use, ask them to write down the test name, the location, and the result.

Space for the tank, the brine, and service access

Have the technician measure the floor area, the ceiling height at the spot you are considering, and the distance to the nearest drain and outlet. Ask how much clearance they plan to leave around the tank for future service, and where a salt bag will be set and carried. Check that the floor is level and can carry the weight of a full tank. Measure the doorways and hallways the equipment will pass through, because a unit that does not fit through the door adds work and can add cost.

Power, drain, and bypass points

Note where the nearest outlet is and whether the installer intends to use it. Ask where the drain will discharge and whether the plan needs a pump or a gravity path. Ask where the bypass valve will sit relative to the main line. You do not need to settle the routing details during the visit, but you should leave knowing where each connection is expected to go, so the install plan is not decided on the day the crew arrives.

Ask for a sketch before you sign

Ask the technician to draw a simple sketch of the planned layout and mark the tank, the bypass, the drain, the power source, and the main supply line. Then compare the sketch to the quote. If the quote describes a different location, a different number of taps, or a different unit than the sketch shows, ask for the difference in writing before you agree. A sketch with measurements is the clearest record you can keep from the visit, and it gives you something concrete to check when the crew shows up.

Questions to ask before they leave

Ask which taps will be treated and whether the quote covers each one. Ask what changes if the measured pressure, space, or drain point turns out to be different on install day. Ask who will confirm the final layout and whether that person is the same one who did the visit. Write down the answers next to the measurements. If the visit left you with a number you cannot explain, do not sign until someone explains it.