The install crew leaving is not the end of the job. A reverse osmosis unit is a set of tanks, valves, filters and a membrane, and the first hours of running it show whether it was connected and started up correctly. This guide covers the startup sequence after installation, so you know what to watch for and what to ask before you sign off.

Get the startup steps in writing first

Before the installer leaves, ask for the startup procedure from the manufacturer's manual or the installer's own sheet. Check that it lists the order of steps, any flush the membrane needs, and whether a filter cartridge must be checked or replaced before first use. If there is no written sheet, ask who will provide one and how to reach them if a step is unclear.

Check the feed and the shutoffs

Confirm the cold supply valve feeding the unit is open and the unit's own isolation valve is in the position the manual calls for. Look at each pre-filter housing and cartridge to make sure the flow arrows point the way the water travels. A cartridge installed backward can restrict flow, and it is easy to miss once the housings are closed.

Pressurize in stages and watch every fitting

Open the supply slowly and let the pre-filters fill. Walk the whole run with a dry paper towel or a dry hand, including the tubing at the faucet, the storage tank valve, the drain connection and every shutoff. Mark or photograph any drip and tell the installer before they leave. Some fittings need the tubing reseated rather than more tightening, so ask before you tighten anything.

Let the storage tank fill and watch the drain

The storage tank fills gradually, and the membrane may take some time before it produces a steady flow. Listen to the drain. Water should run to the drain line steadily while the unit makes product water, and it should not back up through the sink trap or the drain air gap. Make sure the drain tubing is not kinked and is not sitting in standing water.

Run the flush and the first draw

Follow the flush the manual specifies. It is often a timed drain run or a sequence the unit signals when complete. Do not improvise your own timing. Once the flush finishes, draw from the faucet and let it run until the water is clear and the storage tank has had time to refill. Discard the first water from the tank if the instructions say to. Taste the water and look at a clean glass in daylight. Cloudiness, fine particles or an unusual odor after the flush is complete should go back to the installer, not be written off as normal startup behavior.

Confirm the output and the paperwork

If the unit has a monitor or gauge, ask the installer to show you where to read it and what a normal reading looks like for your model. If there is no monitor, ask what they recommend for checking output over the first few weeks. Ask what the filter replacement schedule is, who handles the first change, and whether the warranty clock depends on this startup or on the install paperwork. Write the answers on the install sheet before the paperwork is filed.

What to keep for later

Keep the startup sheet, the filter part numbers, the installer's phone number and the name of the person who signed off at startup. Set calendar reminders for the first filter check and the first tank pressure check. When something changes later, you will know whether it started at installation or after months of normal use, which makes any call to the installer faster and clearer.