A quote is an offer with a shelf life. Before you sign, the most useful line on the page is often not the total but the sentence that says how long that total holds and what it covers. Many homeowners treat a number as a promise. In practice it is usually a snapshot that stays valid only under stated conditions.
Find the expiry date and the start date
Look for a validity period, either a number of days or a calendar date. Then confirm when the clock starts. Some quotes count from the date written at the top, others from the day of the site visit or the day the quote was emailed. If the start point is unclear, ask the company to write it out in plain words on the document. Put the expiry date on your calendar the day you receive the quote.
Check what the price lock actually covers
A price lock can mean very different things. Ask whether it covers equipment only, labor only, or both. Check whether permit fees, delivery, removal of the old unit, travel charges, and sales tax are inside the locked figure or added later. If the quote says prices are subject to site conditions, find out which conditions it means, such as added pipe runs, a different electrical circuit, or drain work. Those are the points where a locked total quietly becomes a larger one.
Know what counts as accepting
Find out what you must do to hold the price. Some companies need a signed agreement, others need a deposit, and some need both before the expiry date. A verbal yes or a casual reply email may not count. Ask what form of acceptance they require and whether they will confirm in writing that your acceptance was received before the date passed.
Compare the quote to the signed contract
When the contract arrives, lay it beside the quote and read the two together. The equipment model, the line items, the price, the warranty terms, and the scope of work should match. If the contract adds a charge or drops an item, ask for the difference in writing and do not sign until the two documents agree. A quote that was valid on one page and a contract that differs on the next are two different deals.
If the date is about to pass
If you need more time to decide, ask for a written extension before the expiry date, with the new date and the price stated. A verbal promise to hold the price is hard to prove later. If the company refuses, ask for an updated quote so you can see what has changed and why. Keep every version of the quote, the emails about it, and the signed page together in one folder.
What to ask before you accept
Ask which items are locked, which are estimates, and what triggers a change. Ask who approves a change order and how you will be told about it before work starts. Ask whether the quote covers only the site visit or the full installation. The answers show how much of the number you can plan around.